Water Police, Hansweert - Zeeland

The office building of the water police and water maintenance officials is fully prefabricated and was assembled on site in 4½ months. The form of the building is inspired by the container ships that pass the site. The facade is made out of industrial glass and aluminium cladding. Each organization has its own glass entrance hall. Artist B. Trenning designed the surroundings. This project has been nominated for the Zeeland Architecture Prize.

1999–2000     1,130 m2     € 1.5 M